× Bidding has ended on this item.

2013 HARDINGE GX-1000 VERTICAL MACHINING CENTER W/ 4TH AXIS

OSP P-200 control, Full Enclosure, with 4th Axis, 10,000 RPM Spindle Speed
 
Listing Image
Auction Buyer's Premium (does not apply to Buy Now)
  • 15.00 %
Current Price $13,900.00   ( ) Successful
Buy Now Price $0.00
Available for immediate purchase.
End Date  [Extended]
Bid History 80 Bids  
Start Date
Listed By   Auctions
  0
Description
Make Hardinge 
Model GX-1000
Year 2013
Machine Type  Vertical Machining Center w/4th Axis  
Location Ohio
Machine Description
4-Axis Vertical machining center with 1 meter bed length. Fully equipped with a Komo 4th Axis rotary. Tooling available; OSPF P-200 control; Upgraded 30 Tool Changer
Technical Details  
X-Axis Travel 40.16"
Y-Axis Travel 21.25"
Z-Axis Travel 21.25"
Table Size 44"x21.25"
Table Capacity 1760 Lbs.
Spindle Speeds 0 - 10,000 RPM
Spindle Taper   CAT40
Rapid Traverse Rate (All Axes) 1417 IPM
Cutting Feed Rate 0.1 IPM - 472 IPM
Tool Magazine  30-ATC
Equipped With
OSP P-200 control
Full Enclosure
With 4th Axis
Koma 4th Axis wired for 4th
Mist Collector 
Original Manuals Included 
All Pictured Tooling Included 
Location
615 N Agner St, Ottawa OH 45875
Dimensions for Transportation                                                                                                     
Components Quantity  Dimensions  Weight
Machine Size 1 120" x 89" x 110" 12100 lbs.
Chip Conveyor  1 120" x 25" x 60" 3000 lbs.
Mist Collector 1 36" x 36" x 40" 500 lbs.

FULL PAYMENT DUE BY JUNE 26, 2020. REMOVAL BY JULY 3, 2020. NON-NEGOTIABLE LOADING COST OF $950.00 WILL BE ADDED TO INVOICE, NOT SUBJECT TO BUYER'S PREMIUM.

All auction items are sold AS-IS, WHERE-IS unless otherwise specified.   ALL SPECIFICATIONS ARE ASSUMED TO BE CORRECT BUT MUST BE CONFIRMED BY PURCHASING ENTITY

JUN24

Additional Information
Make Hardinge
Model GX-1000
Year 2013
Control OSP-P200
Location Ohio
Reference Number 3555923
Payment Options
  • Payment Instructions:  Full payment due within 2 business days of auction end and receipt of invoice, unless otherwise specified. If full payment is not received by due date the sale will be considered forfeited and buyer is still responsible for the 15% buyers premium.